EPD OF HIGH-SPEED TRACK MANUFACTURING AND MAINTENANCE SERVICE

CLIENT: Vías y Construcciones S.A.

SERVICE: EPD

YEAR: 2017

Estepar – Palencia

Development of EPD and calculation of the Life Cycle Analysis (LCA), in collaboration with the CARTIF Technological Center, of the construction and maintenance services of the high-speed track infrastructure.

The construction service includes 33 km of high-speed track assembly, in 1,435 mm wide ballast, between Quintana del Puente and Estepar. The maintenance service corresponds to the high-speed line between Chamartín and Valladolid, with a distance of 179 km.

 

 

More Projects of EPD