EPD OF M300 METRO UNIT
CLIENT: CAF-Construcción y Auxiliar de ferrocarriles S.A.
SERVICE: EPD
YEAR: 2015
Beasain - Gipuzkoa
Development of an EPD and the Life Cycle Analysis (LCA) of the M300 metro unit for the city of Helsinky. Bidirectional four-car railway unit, with capacity for 700 passengers and weighing almost 130 tons.
The selection of its materials makes it a highly recyclable metro unit at its end of life (93.6% recyclability rate) and the configuration of the highly efficient auxiliary systems and the traction system allows to achieve very low energy consumption (0.012 kwh / pass.km).
More Projects of EPD